A new renovation "completion inspection" is not simply a quick look around — it involves systematically verifying, against the contract, quotation, drawings, and material samples, whether each item of work has been completed, whether all functions are operating correctly, whether the workmanship meets the required standard, and whether there are any defects requiring rectification. Ideally, inspections should be conducted in three separate stages — concealed works, interim works, and final handover — rather than waiting until all works are finished before carrying out the first inspection.
Cross-reference the following documents:
Check each item for anything omitted, done incorrectly, under-delivered, or where materials were substituted without approval. For bespoke furniture, pay particular attention to dimensions, door swing direction, internal shelf layout, number of drawers, hardware, and finishing details.
For work required to be carried out by a registered electrical contractor, request the relevant test certificates or completion documents from the contractor — do not rely solely on a phone charger test as a safety assessment.
Kitchens, bathrooms, balconies, and utility platforms are the key areas to inspect:
Waterproofing is best tested before tiling using a closed water test (flood test). The common practice is to test for no less than 24 hours; some renovation projects arrange for 48 hours. The actual duration should follow the contract, material system, and engineer's requirements.
After completion, drains, fixtures, and joints should be tested again, as tiling, drilling, or fixture installation may damage the existing waterproofing layer.
If hollow spots are found, do not focus on a single location alone — record the positions and extent, then let the contractor assess whether removal and re-laying is required. Common claims online that "exceeding a certain percentage automatically fails" do not apply to all materials and contracts; the applicable standard should be based on the contract specifications, construction standards, and professional judgement.
Areas near windows and using side lighting at night are usually the easiest places to spot uneven walls and filler marks.
Prepare contracts, drawings, quotations, samples, and change records in advance.
Conduct an overall walkthrough first, then test each item room by room.
Photograph, number, and mark the location of each issue found.
Record all issues in a formal "defect list" — do not rely on verbal communication alone.
Confirm the rectification method and deadline for each item with the contractor.
Re-inspect each item after rectification, with particular attention to water, electrical, waterproofing, and equipment.
Only sign the formal acceptance document after all major issues have been resolved.
Handle the final payment and retention of warranty funds in accordance with the contract.
Industry practitioners often recommend withholding a portion of the final payment until major defects are rectified. However, the amount and method of retention must comply with the contract — arbitrary deductions are not permitted. The safest approach is to stipulate the final payment terms, retention amount, acceptance standards, and defect rectification deadlines clearly in the contract from the outset.
The sooner you identify leaks, misalignment, hollow tiles, or electrical issues, the easier it is to carry out targeted repairs. If problems are only discovered after moving in, you may need to move furniture, dismantle cabinets, remove tiles, or redo paintwork — significantly increasing both cost and time.
A written defect list gives the owner clear documentation that the works have not been fully completed, preventing contractors from claiming "delivery has been made" as grounds to demand full payment of the outstanding balance.
Electrical systems, gas, water heaters, waterproofing, and structural alterations are not merely cosmetic concerns. An inspection can identify electrical faults, water leaks, overheating, inadequate ventilation, and other safety hazards at an early stage.
Photos, test results, drawings, and inspection records can clearly show:
Inspection documents, completion dates, and defect records typically affect when the warranty period begins and any subsequent follow-up repairs. You should request that the warranty scope be clearly stated in writing, including individual timeframes for plumbing, electrical, waterproofing, carpentry, hardware, appliances, and paintwork — do not simply accept a blanket "one-year whole-flat warranty."
Only inspecting in daylight from a distance, not checking walls under raking light.
Only checking appearance, without testing water, electricity, drainage, and equipment.
Laying tiles or sealing surfaces before waterproofing has been tested.
Accepting substitute materials without cross-referencing the quotation.
Only reporting issues verbally via WhatsApp, without a formal defect list.
Signing off "all completed" without re-inspection.
Repairing defects independently after discovery, making it difficult to establish liability.
Paying the final balance before obtaining drawings, test records, warranty cards, and equipment manuals.
Judging pass or fail based on a single online standard, ignoring the contract and actual intended use.